MCST 4-26-18 7927
The last column is moved into place.
MCST 4-26-18 7921
Almost all major steel is in place. This is the “spine” of our building.
MCST 4-26-18 7920
The last of the major steel goes into place.
MCST 4-26-18 7960
This will be our second floor hallway
MCST 4-26-18 7948
The artistry in the placement of steel.